Full House Renovation in Lahore

Bring an older Lahore home up to date. Get quotes from verified contractors for rewiring, replumbing, new floors, finishes and full refurbishment.

Get free quotes

Renovation & Rebuilding

Full House Renovation in Lahore

Part of Renovation & Rebuilding in Lahore · Construction services in Lahore

Full house renovation in Lahore is a common choice for families living in homes built a generation ago in areas like DHA's older phases, Garden Town or Johar Town. The structure may still be sound, but the wiring, pipes, floors, kitchen and washrooms have had their day. Houseplot lets you describe the house once and get quotes from verified contractors who specialise in complete renovations.

A full renovation goes much further than paint and new tiles. It usually means stripping finishes back, replacing hidden services, fixing damp and then rebuilding the interior to a modern standard. Done well, it can give an older house a new life without the cost and upheaval of rebuilding.

This page explains what a full renovation usually involves, how to plan and price it, and the checks that matter most. The cost table below offers a broad guide.

  • Stripping old flooring, tiles, plaster and fittings where needed
  • Complete rewiring with new distribution boards and earthing
  • Replacing water supply and drainage pipes
  • Damp treatment, seepage repairs and roof waterproofing
  • New plaster, flooring, wall tiles and skirting
  • Kitchen and washroom renovation
  • New doors, windows and wardrobes where required
  • Paint, polish and exterior facade refresh

Get free quotes

Free · verified contractors send written quotes · your number goes only to the ones you allow.

How it works

Step by step

Assess the house

Share photos and details of the house, its age and the problems you know about, such as damp, leaks or tripping circuits.

Inspection visits

Contractors inspect the house to check structure, services and damp before preparing their quotes.

Plan the scope

Decide which rooms and systems will be renovated, and whether you will stay in part of the house or move out.

Compare quotes

Look for quotes that separate stripping out, services, civil repairs and finishes, with clear rates for hidden problems.

Renovate in sequence

Work usually runs from demolition and services to plaster, flooring, woodwork, fittings and paint.

Snag and handover

Walk through every room, test every system and list defects before releasing the final payment.

Choosing a renovation contractor

Renovation needs patience and problem-solving. Ask contractors about renovations they have done on houses of a similar age and what they found once the walls were opened. Good contractors will talk about surprises honestly.

Check that they have reliable electricians and plumbers, because services are the core of most full renovations. Ask how they will protect parts of the house that are not being worked on.

Ask, too, how they schedule the trades. A well-run renovation keeps electricians, plumbers, masons and carpenters moving in a sensible order so one team is not waiting for another or breaking work that has just been finished.

  • Similar renovations you can see
  • Strong electrical and plumbing teams
  • Plan for dust control and protection
  • Clear approach to hidden problems

Contracts and payments

A renovation contract should list fixed work, such as measured areas of flooring and counted fittings, and provisional work, such as hidden pipe replacement or damp repairs, with agreed rates and limits.

Tie payments to finished stages and keep every variation in writing. Agree how long the house may be without water or power at a time if you are living there.

Quality checks before walls close

The most important inspection happens before plaster and tiles cover new services. Check that pipes are pressure tested, wiring runs in proper conduit with the correct cable sizes and every circuit is labelled on the board.

In washrooms and on roofs, see that waterproofing is complete and tested before tiles go down. Take photos of every wall before it is covered so you know where services run.

Finally, check finishes room by room at handover: tile joints, paint coverage, door alignment, socket positions and water pressure at every tap.

  • Pressure test new water lines
  • Check wiring sizes and earthing
  • Flood test washroom floors and roofs
  • Photograph walls before plaster
Budget

Approximate costs in Lahore

ItemApproximate cost (Lahore)Calculator
Light renovationRs 190–540 per sq ftCalculate
Medium renovationRs 860–3,210 per sq ftCalculate
Full renovationRs 3,740–5,670 per sq ftCalculate
Kitchen (standard)Rs 1.9 lac–9.6 lac per kitchenCalculate
Washroom (standard)Rs 1.1 lac–7.5 lac per washroomCalculate
Approximate ranges from Houseplot's price calculators, 2026-10. Final cost depends on design, materials, site and contractor — compare written quotes.
Before you hire

Checklist

  • Structural check if any walls, openings or slabs will change
  • Approval from your society or authority for structural or elevation changes
  • Quote that separates fixed and provisional work
  • Agreed rates and limits for hidden repairs
  • Plan for living arrangements, dust and security during the work
  • Written snag list and final payment holdback
Plan, design & build

Drawings, materials, costs and professionals

FAQs

Full House Renovation in Lahore: questions

Is it better to renovate or rebuild an old house?

If the structure is sound, renovation is usually quicker and less costly. If columns, beams or foundations have serious problems, rebuilding may make more sense. A structural engineer's inspection will help you decide.

Do I need approval for a full renovation?

Internal finishing usually does not. Structural changes, new openings in load-bearing walls or a new front elevation often do. Check with DHA building control, the Bahria Town planning office, LDA, the Cantonment Board or the TMA.

Can we stay in the house during the renovation?

It is possible if work is phased, but full renovations involve water and power cuts, dust and noise. Many families move out for the main stages. If you stay, agree which rooms will stay usable and how water and power cuts will be planned.

How do contractors price hidden problems?

Good quotes set agreed rates for items like extra pipe replacement or damp repairs, with a limit you must approve before it is exceeded. Ask for photos of any hidden problem before the extra work begins.

How much does a full house renovation cost?

It depends on house size, age, scope and finishes. The cost table below gives a broad guide; site-based quotes will be more accurate.

Ready to get quotes?

Describe the job once — verified contractors in Lahore send written quotes.

Get a quote

Verified agents serving this area reply with real, available options and current prices. Your number is never published.