Grey structure construction in Lahore is the stage where your house takes its real shape. It covers everything from the first trench to the roof slab, along with the pipes and conduits that will later sit inside the walls. Houseplot lets you share your approved drawings once and receive quotes from verified contractors who build grey structures in your society.

Because the grey structure holds up the whole house, it is the stage where shortcuts are hardest to fix later. Weak concrete, poorly placed sariya or uneven brickwork will follow you through finishing and beyond. A careful contractor and regular checks matter more here than at any other point.

Many owners take a grey structure contract first and arrange finishing separately, either with the same builder or someone else. This gives you more control over finishes and spending. The cost table below gives a rough idea; contractors will price your exact drawings.

  • Site clearing, layout marking and excavation
  • Foundations, plinth beams, damp-proof course and termite treatment
  • RCC columns, beams, slabs and staircases as per structural drawings
  • Brick or block masonry for external and internal walls
  • Roof slab with basic waterproofing and drainage outlets
  • Electrical conduit, switch boxes and earthing points embedded in walls and slabs
  • Water supply, drainage and sewerage pipe lines up to the shell stage
  • Septic tank, underground water tank and overhead tank structure where required

Get free quotes

Free · verified contractors send written quotes · your number goes only to the ones you allow.

How it works

Step by step

Share drawings and plot details

Upload your approved architectural and structural drawings, or tell us your plot size and number of storeys if drawings are still in progress.

Compare grey structure quotes

Contractors send quotes that state the material specifications, the stages covered and what is excluded.

Agree materials and responsibility

Decide whether the contractor supplies all materials or you buy some yourself, and write this into the contract clearly.

Foundations and plinth

Excavation, foundation concrete, plinth beams and damp-proofing are completed and checked before walls begin.

Frame, walls and slabs

Columns, brickwork and slabs go up floor by floor, with conduit and pipes laid in the right places as work proceeds.

Roof and close-out

The roof slab is cast and cured, debris is cleared and the shell is handed over ready for finishing.

Choosing a grey structure contractor

Visit a site the contractor is building right now. Look at the shuttering, the straightness of columns, the spacing of sariya and how bricks are soaked before laying. A tidy site with materials stored off the ground is usually a good sign.

Ask who mixes and pours concrete, whether ready-mix or site-mixed concrete is planned for slabs and how curing will be done. Ask, too, how the contractor handles the society's inspections.

  • Running site you can inspect
  • Named site in-charge for your house
  • Clear plan for concrete and curing
  • Familiarity with your society's building rules

Contracts and payment stages

Grey structure contracts are usually priced per square foot of covered area or as a lump sum for the drawings. Either way, the contract should list cement, steel, brick and sand specifications, slab thickness and the concrete mix ratio set by your engineer.

Tie payments to finished stages such as excavation and foundations, each slab, brickwork and the roof. Avoid large advances, and keep a written record of every payment and every agreed change.

Site checks that protect your structure

The key moments are before each concrete pour. Check that the sariya size, number and spacing match the structural drawings, that cover blocks are in place and that shuttering is firm and clean.

After pouring, curing matters as much as mixing. Slabs and columns need to be kept wet for the period your engineer advises. Brickwork should be in line and plumb, with joints filled properly. Photograph every stage before it is covered.

  • Steel checked against drawings before every pour
  • Concrete cubes taken for slabs where practical
  • Proper curing after each pour
  • Conduit and pipe routes photographed before plaster
Budget

Approximate costs in Lahore

ItemApproximate cost (Lahore)Calculator
Grey structureRs 2,690–4,490 per sq ftCalculate
Finishing (standard)Rs 3,070–4,490 per sq ftCalculate
Finishing (premium)Rs 4,800–10,110 per sq ftCalculate
Complete house (standard)Rs 6,140–8,030 per sq ftCalculate
Complete house (premium)Rs 8,260–14,390 per sq ftCalculate
Basement (extra)Rs 670–1,070 per sq ftCalculate
Approximate ranges from Houseplot's price calculators, 2026-10. Final cost depends on design, materials, site and contractor — compare written quotes.
Before you hire

Checklist

  • Approved building plan from your society or authority, with architect (PCATP) and structural engineer (PEC) signatures
  • Written specification for cement, sariya, bricks, sand and concrete mix
  • Clear statement of what is excluded, such as boundary wall, water connection or plaster
  • Payment plan linked to finished stages
  • Agreement on who supplies water and electricity for construction
  • Plan for periodic engineer visits before major pours
FAQs

Grey Structure Construction in Lahore: questions

What does grey structure include?

It normally covers excavation, foundations, columns, beams, slabs, brick walls, the roof and the pipe and conduit lines inside walls and slabs. It does not usually include plaster, flooring, woodwork, paint or fittings, but check each quote.

Should the contractor supply materials or should I?

Contractor-supplied materials mean one point of responsibility. Owner-supplied materials give you more control over quality and price but require time and site visits. Some owners buy steel and cement themselves and leave the rest to the contractor.

Do I need approval before starting grey structure work?

Yes. Your society or authority needs to approve the building plan first. DHA has its own building control, Bahria Town its planning office, and LDA, the Cantonment Board or the TMA cover other areas. Confirm current rules with them.

Can I change the layout during construction?

Small changes may be possible, but anything affecting columns, beams or slabs needs your structural engineer's approval and possibly a revised plan. Changes also affect cost and time.

How much does grey structure cost in Lahore?

It depends on covered area, storeys, basement and current material rates. See the cost table below for a rough guide, then compare quotes for your drawings.

Ready to get quotes?

Describe the job once — verified contractors in Lahore send written quotes.

Get a quote

Verified agents serving this area reply with real, available options and current prices. Your number is never published.