Earth filling (bharai) — bulk supply in Lahore
Earth filling (bharai) raises a low plot or fills under floors with soil delivered by the trolley or truck; work out the volume from a level survey, fill in compacted layers and check each load for rubbish and clay lumps.
Get quotes from verified suppliers
Earth filling (bharai) raises a low plot or fills under floors with soil delivered by the trolley or truck; work out the volume from a level survey, fill in compacted layers and check each load for rubbish and clay lumps.
- Free to request — mobile number required, login optional
- Checked by our Lead Desk before it goes out
- Choose how many can contact you (1–5)
- Your number is never published
Earth filling (bharai) — estimated prices
Local pit sand for filling (per cft)
Earth filling (mitti bharai), supplied, spread and compacted
Prices are approximate and change with grade, quantity and delivery. Click Get quote for exact prices.
Many Lahore plots sit below the road, especially where roads have been raised over the years or in newly developed schemes. Earth filling (mitti bharai) lifts the ground so rainwater drains away from the house and the plinth sits at the right height. It sounds simple, but poorly chosen or uncompacted fill can settle under floors and boundary walls for years.
Types and specifications
| Type | Description | Typical use |
|---|---|---|
| Ordinary earth (mitti) | Excavated soil from other sites or borrow pits | Raising plot levels, lawns |
| Sandy soil | Soil with a higher sand content | Filling where better drainage and compaction are wanted |
| Sand fill | Fine sand used as fill | Under floors, around foundations, per engineer |
| Topsoil | Soil suitable for planting | Lawns and gardens, top layer only |
| Rubble fill | Broken brick and concrete | Only where the engineer allows; not under floors without approval |
Your engineer or contractor should specify which fill goes where. Fill under floors and foundations usually needs more care than fill for a lawn.
What it is used for
- Raising a low plot to road level or above
- Filling inside the plinth before floors are laid
- Backfilling around foundations
- Lawns, gardens and landscaping
Quality checks on delivery
- Contamination: reject loads with rubbish, plastic, construction waste, roots or animal waste.
- Clay lumps: large hard clods are difficult to compact. Ask the supplier for broken-down soil.
- Organic matter: dark, smelly or root-heavy soil settles as it decays; keep it out of structural fill.
- Moisture: very wet soil is hard to compact; very dry soil needs watering.
- Measure the load before unloading.
How much you need
Start with a level survey. It records your plot level against the road and neighbouring plinths, so the architect can set the target level. Then:
Volume (cft) = area to fill (sq ft) × average depth (ft)
For example, filling a 2,250 sq ft area (a 10 marla plot on a 225 sq ft marla) by an average of 2 ft needs 4,500 cft of loose soil before compaction. Compacted soil takes up less space than loose soil, so you will need more delivered than this figure. Ask your contractor or engineer how much to add for your soil and method.
Filling and compaction
- Clear the plot of rubbish and vegetation.
- Spread fill in thin layers, not one deep dump.
- Water each layer to the right moisture.
- Compact each layer with a roller or plate compactor.
- Check levels against the survey benchmark as you go.
Your engineer should set the layer thickness and compaction method, especially under floors.
Bulk-buying tips
- Delivery: confirm vehicle size and route; heavy trucks may damage society roads, and some societies limit them.
- Unloading: tip directly where needed to save double handling.
- Invoices: get a slip per load with date and quantity.
- Payment: pay per measured load or per agreed trolley size, not a big advance.
- Permissions: check society rules on heavy vehicles, stacking material and machinery. In DHA Lahore, a mechanical excavator needs permission (12 working days, Rs25,000 refundable security), and stacking material needs approval (8 working days, free) (DHA Lahore Building Control).
What affects the price
We do not have a sourced Lahore rate for earth filling. Get written quotes per cft or per trolley. Factors include:
- Type of fill (ordinary earth, sandy soil, sand, topsoil)
- Source and haul distance
- Vehicle size and street access
- Whether spreading and compaction are included
- Season (monsoon can affect supply and access)
- Total volume
FAQs
How much filling does my plot need? Get a level survey first. The surveyor can work out the volume to reach your architect's target level.
Can I fill with construction waste? Not under floors or foundations without your engineer's approval. It can leave voids that settle later.
Should filling be done before or after the boundary wall? Discuss with your contractor. The boundary wall and foundations must be designed for the soil they will hold back.
Why did my floor crack after filling? Often because the fill was not compacted in layers. Compaction is as important as the soil itself.
Sources
- DHA Lahore — Building Control — excavator permission and material stacking approval
Related products
Ravi sand
Ravi sand is fine local river sand sold in bulk across Lahore, commonly used for filling and non-structural work; it is priced by volume, so measure each load in cft and get your engineer's advic
Chenab sand
Chenab sand is a fine river sand widely used in Lahore for brickwork mortar and plaster; a 2019 CUST study found it made good mortar but was not ideal on its own for concrete, so use it where your con
Crush (bajri)
Crush (bajri) is crushed stone aggregate used in Lahore concrete for foundations, columns, beams and slabs; it is sold per cft, with Houseplot data showing about Rs105 per cft in July 2026, and size a