Crush (bajri) — bulk supply in Lahore
Crush (bajri) is crushed stone aggregate used in Lahore concrete for foundations, columns, beams and slabs; it is sold per cft, with Houseplot data showing about Rs105 per cft in July 2026, and size and cleanliness matter as much as price.
Get quotes from verified suppliers
Crush (bajri) is crushed stone aggregate used in Lahore concrete for foundations, columns, beams and slabs; it is sold per cft, with Houseplot data showing about Rs105 per cft in July 2026, and size and cleanliness matter as much as price.
- Free to request — mobile number required, login optional
- Checked by our Lead Desk before it goes out
- Choose how many can contact you (1–5)
- Your number is never published
Crush (bajri) — estimated prices
Sargodha crush, ½ in (per cft)
Crush, per dumper load
Pathar / stone ballast, 2–4 in (per cft)
Prices are approximate and change with grade, quantity and delivery. Click Get quote for exact prices.
Crush, called bajri on most Lahore sites, is the coarse aggregate in concrete. With cement, sand and water it forms the foundations, columns, beams and roof slab of your house. Good crush is hard, clean and of the size your engineer specifies. Dusty, flaky or mixed crush makes weaker concrete, however good the cement.
Types and specifications
| Type | Description | Typical use |
|---|---|---|
| Single-size crush | Crushed stone screened to one nominal size | Structural concrete, as specified by the engineer |
| Smaller-size crush | Finer crushed stone | Thin sections, toppings, some precast work |
| Mixed / graded crush | A blend of sizes | Concrete where the mix design calls for it; sub-bases |
| Stone dust / screenings | Fine by-product of crushing | Bedding and some blocks; not a substitute for sand unless specified |
| Brick ballast | Broken brick, not stone | Soling and sub-base under floors, per engineer |
Crush is usually ordered by nominal size (often stated in inches on Lahore sites). Use the size on your structural drawings or the engineer's mix design. If none is stated, ask before ordering.
What it is used for
- Reinforced concrete: footings, columns, beams, slabs, stairs
- Plain concrete: blinding under foundations, floor bases
- Paving and driveway bases, as specified
- Precast items such as kerbs and blocks
Quality checks on delivery
- Size: pick up a handful. Most pieces should be close to the size you ordered.
- Shape: angular, cube-like pieces are better than flat, flaky or elongated ones.
- Dust and clay: excessive dust coats the stone and weakens the bond with cement. Clay lumps should not be present.
- Hardness: pieces should not crumble when struck together.
- Contamination: no soil, roots, plastic or brick mixed in.
- Measure the load in cft before unloading.
If you have doubts on a large order, ask your engineer about a lab test for grading and strength.
How much you need
Concrete quantities come from the structural drawings. Your contractor should give crush quantities in cft from the mix design. We do not quote a per-sq-ft rule here, as it depends on slab thickness, foundation design and mix.
Measuring a load: multiply the inside length and width of the trolley or truck by the average height of crush, all in feet. Check several points if the load is heaped.
Bulk-buying tips
- Order before each pour, with some margin, so a pour is not stopped halfway.
- Delivery: confirm vehicle size and street access, and when it will arrive.
- Unloading: on a hard, clean surface. Keep crush separate from sand and soil.
- Washing: dusty crush is often washed on site before use; ask your contractor.
- Invoices: a slip per load with date, size, cft and rate.
- Payment: pay per measured load.
- Storage: keep heaps away from drains and traffic; avoid mud splashing onto the stock.
What affects the price
Houseplot construction rate data puts crush in Lahore at about Rs105 per cft (July 2026; data compiled 18 October 2026). Quotes vary with:
- Quarry source and distance to Lahore
- Size and screening
- Fuel prices and haul distance
- Vehicle size and site access
- Order size
- Delivery and unloading terms
Compare written quotes on the same size and unit.
Common mistakes on site
- Ordering crush before the size is confirmed on the drawings
- Dumping crush on bare mud, where the bottom layer gets mixed with soil
- Using the dustiest part of the heap for the slab pour
- Running out mid-pour and topping up with whatever is available nearby
- Letting the mixer operator change the mix without the engineer's say-so
FAQs
Which size of crush do I need? The one your structural engineer specifies. Different elements can use different sizes.
Why is dusty crush a problem? Dust coats the stone and reduces the bond with cement paste, which can weaken concrete. Wash or reject very dusty loads, as your engineer advises.
Can I use brick ballast instead of crush? For soling and sub-bases, often yes. For structural concrete, use the stone aggregate your engineer specifies.
Is crush sold by weight? In Lahore it is usually sold by volume (cft) or by the trolley or truck. Ask which basis is quoted.
Sources
- Houseplot construction rate data (18 October 2026) — crush rate per cft (July 2026)
Related products
Ravi sand
Ravi sand is fine local river sand sold in bulk across Lahore, commonly used for filling and non-structural work; it is priced by volume, so measure each load in cft and get your engineer's advic
Chenab sand
Chenab sand is a fine river sand widely used in Lahore for brickwork mortar and plaster; a 2019 CUST study found it made good mortar but was not ideal on its own for concrete, so use it where your con
Earth filling (bharai)
Earth filling (bharai) raises a low plot or fills under floors with soil delivered by the trolley or truck; work out the volume from a level survey, fill in compacted layers and check each load for ru
Ready for quotes?
One free request — verified providers reply with written quotes.